Owner Services » Follow a Najad Build » February 2011

Progress has been excellent in February with work continuing throughout the boat.

Hull being prepared for treatment with epoxy primer and antifouling

A solid stainless steel pole on aft deck is being used for installation of various antennas. Teak deck is now finished including the three water tight hatches.

Cockpit including the famous Najad designed windscreen

Bow thruster and propeller installed

Floor boards being installed /  Starboard crew cabin /  All wires connected, tested and documented

Bow thruster and Watermaker, that will produce 120L/hrs

The microwave is in!

The flatscreen TV is installed and tested.

Plotter and max view instruments

Port pedestal

Starboard pedestal

Batteries and tanks